Tajikistan
Recent Issues
2016
Home
Recent Issues 2016
Tajikistan
"25th Anniversary of Independence"
Issue date: 2016

The imprinted stamp shows a portrait of the Tajik President Emomali Rahmon.

The illustration shows an artists composition of Tajik powerplants on the Vakhsh river, which passes through very mountainous territory. Top right is depicted the Nurek dam power plant, located in a narrow canyon, 300 metres deep and 40 metres wide, the right bottom shows the Sangtuda 1 hydroelectric power plant, which is one of four dams, downstream of Nurek. The other three are known as Baipaza, Sangtuda 2 and Golovnaya.

 

 

Tajikistan
Recent Issues
2016
Home